NEWS FROM MISANO WORLD CIRCUIT

March 29, 2021

This morning the assembly of the calendered metal beams , which characterize the east facede of the new Box Building, began.
The small waves take place and form part of the covering of the terraces on the second floor.
The skeleton is almost finished and the shapes are defined, soon we will be able to see the assembly of the facades.